Right this is doing my head in.
Ive got 5 designs (design 1,2,3,4 and 5) and five criteria (Torsional stiffness, stress, mass, cost, ease of manufacture)
Ive marked the 5 designs (1 to 5) for each criteria. But heres the thing, some of the criteria are more important than others, so Ive weighted them (1-5) Ie
Torsional stiffness - (most important)
stress
mass
cost
ease of manufacture - (least)
ive got all this in excel, but how the f**k do I show which design comes out best??
hope this makes sence.
Ive got 5 designs (design 1,2,3,4 and 5) and five criteria (Torsional stiffness, stress, mass, cost, ease of manufacture)
Ive marked the 5 designs (1 to 5) for each criteria. But heres the thing, some of the criteria are more important than others, so Ive weighted them (1-5) Ie
Torsional stiffness - (most important)
stress
mass
cost
ease of manufacture - (least)
ive got all this in excel, but how the f**k do I show which design comes out best??
hope this makes sence.