ClioSport.net

Register a free account today to become a member!
Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

  • When you purchase through links on our site, we may earn an affiliate commission. Read more here.

Labour required for Air Con / PAS delete kit



  182 Track
I am thinking of fitting the Air Con / PAS delete kit to my 182.

Does anyone have an idea of labour time required to fit the kit?

Cheers
 
I removed the aircon and swapped both inlets in about 5hours and im not a mechanic.

So should take someone who knows what there doing less than that i would guess?
 
  Evo
Not a difficult job just fiddly, either way you'll need some timing tools to correctly remove the lower crank pulley should you have pure motorsports lightweight kit.

But then again if your deleting PAS included time to change the rack and then tracking for the new kit.
 


Top