another front subframe, a welder, another set of front end running gear.
Basically you chop the floor out, make up box sections, fit turrets int he back so that the rear end just drops onto the subframe. Bolt it up and theres 2 engines.
Gear linkage isnt to hard, clutch easiest to change to hydraulic, throttle its fly by wire as standard isnt it?