I've gone a little "project management" style and got myself a white board so i can write a list of stuff i need to do. So many times i've gone into my garage, stared at the car thinking "What do i need to do?", and now i can just come in and look at the list and continually add to it :up:
I've finally wired in a resistor for the carbon canister, 10W 22R. All neatly hidden;
Sprayed the grill and Renault badge;
Chopped off the key barrel as i won't be needing it and removed the steering column adjuster lever;
Got some new bits, 4" bass ports for brake ducts, air intake duct for a cold air feed, 4" air ducting hose for the brakes and 3" for the cold air feed. And a DIY LED Shift Light :up:
Where the hose is going to route;
To get the 4" bass ports to fit the standard fog light surrounds i cut little slits which allows it to expand when you push the bass port through. Snug as a bug :up:
Decided to do away with the AC blower and controls and got a standard air blower which i will up directly to a On/Off switch.... Simples :smiley:. I will be blocking up the re-circulating hole.
And finally, i'm still working on fitting the roll cage. Had to drill 7 25mm holes for the mounting plates and their welded nuts to fit through the floor. I'm in the process of refitting the cage once again to double check its still all square and fitting correctly. Once it's bolted up, i'll tact weld the mounting plates into place :up: