Flob
ClioSport Club Member
Why do you need to do it at all? (is what I was getting at).
Another thing to add.
Keep in mind how difficult that’ll be to make on the CNC, vs a more conventional cylinder, with a thru hole, and boss out the side.
@Robbie Corbett I take it this is what people mean by sw having its limits? With surfacing that is.
Took me a bit to figure out how to do the parting line draft, made split lines then deleted the faces and used surface fill. Just don't have much control over the surface and you can see it curve in slightly, no undercuts just wish I had more control. I know bmw use catia which this part is by (e90), dont suppose you know if this type of surfacing would be the thing catia could do easily with control?
View attachment 1715283
View attachment 1715284
View attachment 1715285
View attachment 1715286
Ignore the scan mate, Im on my old pc and its not done a great job picking up the smooth surface, new pc scans so quickly and the quality of the scan is better.Probably drop forged but the surface finish on your scan looks cast.
Does your SOLIDWORKS version have mould tools? You can add a non planar parting line, which lets you create the tooling for either side and add draft angles either side of the parting line.
But it will not, and the designer will not add the flash line. Etc.

Right, so the flash (as you have said) will never be modelled. The split line will be so that you can add a draft angle either side (so the tool can release) and you are right, if the draft is removing material you will need to include it for any stress analysis (or vibration etc).
The split line will be chosen based on the direction of force (or largest force) in use OR chosen to make the part so that it can release from the tooling (no undercuts). Most of the time a designer will aim to simplify tooling as much as possible as that's where the largest initial time/expense is. More often than not the base geometry is created by the designer and then sent to the company who will be moulding/casting/forging the part - they will run their own analysis and decide where to put the split line, where to put release pins, sprues, runners and or gates - that info then goes back to the designer to confirm its ok.
I've had various things injection moulded and I have never designed the tooling, the moulding company has always done that, on some parts I don't even add a draft and ask the moulding company to do that too.
So its entirely possible that the original designer of that suspension part does not have a model which is as accurate as yours 😂
So I 100% appreciate and respect why you are doing this and have done similar before however would also caveat that by saying that for every hour you model this, thats another hour you haven't been able to do your kinematic study which sounds a lot like the main objective of this and for me anyway would be by far the most interesting part.
Check out the mould tools in SW, specifically the parting line as I think that would be an alternative way for you to add the split line and draft.
PS - uni would do nothing but frustrate you imo, you are already a country mile in front of 99% of people coming out of uni, the only thing it really did for me was introduce a load of subjects I didn't know existed, so I could go back to them later in life to self learn what I needed.
Yep, it's the stuff of dreamsSeen it a couple times now lol. Plot of land and work from home, couldn't ask for any more..
I was asked at a previous place to run a second machine. I was doing 10 hour night shifts and they wanted the second machine running for minimum 6 hours for me to get paid for it. They offered me £2.50 an hour and wanted no f**k ups. I was on £22.50 at the time so it didn't seem worth the effort so I told them to get fucked, which they accepted.Is there some un written rule that a machinist can only ever do one machine at a time?
It's going to go tits up in a bad way whether you're staring at it for 20 hours straight or having a nap after 8 hours if PSI was asked at a previous place to run a second machine. I was doing 10 hour night shifts and they wanted the second machine running for minimum 6 hours for me to get paid for it. They offered me £2.50 an hour and wanted no f**k ups. I was on £22.50 at the time so it didn't seem worth the effort so I told them to get fucked, which they accepted.
If I'm somewhere else this could go tits up very easily and cause a lot of damage to the job. As it's already had over 200 hours machining time it's probably best that doesn't happen.
Here's a mad idea, if they put the machines close to each other you can occasionally look at them both 😂Fool I had a nap after 2 hours 😂. I can see from here the tips are getting worn because of how the swarf is so I'll probably stop it and go home soon and leave it for the day wanker to change them.
P. S. He's milled the od undersize today too and tried to blame me 😂.
Have you seen the size of the jobs Paul does?Here's a mad idea, if they put the machines close to each other you can occasionally look at them both 😂
Is there some union where they've banned it?
That's why their buildings all fall over🤣🤣This isn't just Porl, it's all the UK machinists I've ever met!! In China they probably have 10 machines to each person and get deaded if they forget to tap a thread.
They work best during the school holidaysThis isn't just Porl, it's all the UK machinists I've ever met!! In China they probably have 10 machines to each person and get deaded if they forget to tap a thread.
No. I have worked places where one man has run 2 or more machines. But that's OK if it's batch work and the pay is fair. I've always done one offs and when the gaffers decide they don't like me sat while it's running they try to force a second machine into the mix. That would involve a change of contract and fair pay which they don't want to do so I remain lightly employed 😂.Here's a mad idea, if they put the machines close to each other you can occasionally look at them both 😂
Is there some union where they've banned it?
I've run two small cnc lathes at a time in the past but you always find they want more. It also depends on how much you have to check dimensionlly, one can be on stop also if you're setting up another machine or are having problems on one and not the other, it just slows everything down. Like Paul says on the outside it looks easy, but one mistake can be costly especially on big till jobs. I got asked on a nightshift years ago to run one big cnc lathe and two edm machines, I told them to get stuffed and run the lathe and one edm.This isn't just Porl, it's all the UK machinists I've ever met!! In China they probably have 10 machines to each person and get deaded if they forget to tap a thread.