So had a hectic few days and looking at when Mallory is I only have the Thursday before testing on the Friday to get the car ready and that has got to allow for a lot of jobs
Check straps on doors
Wiring diagram and fuse layouts
Clean and mark up dampers
Roll cage padding
Driveshaft gaiter
Corner weight and geo
Alignment and camber equipment
Stickers
Tape rear bumper
Check master cylinder plus get spare
Clean all plus oil leak
Fit 5th gear
Fit wideband sensor
Remove oil cooler and change connection
Load onto trailer
Pack tools
Pack spares
Pack BBQ stuff
Pack bedding and clothes
The new 5th gear has arrived so just got to work out how to fit it lol
A lot of deliveries of spare parts have been arriving!
Sent from my iPhone using Tapatalk 2
Check straps on doors
Wiring diagram and fuse layouts
Clean and mark up dampers
Roll cage padding
Driveshaft gaiter
Corner weight and geo
Alignment and camber equipment
Stickers
Tape rear bumper
Check master cylinder plus get spare
Clean all plus oil leak
Fit 5th gear
Fit wideband sensor
Remove oil cooler and change connection
Load onto trailer
Pack tools
Pack spares
Pack BBQ stuff
Pack bedding and clothes
The new 5th gear has arrived so just got to work out how to fit it lol
A lot of deliveries of spare parts have been arriving!
Sent from my iPhone using Tapatalk 2